~/stamford$cat about.txt

On paper.

Renova Move is a planning office in Stamford, CT. We settle every renovation decision in a written plan set before a new owner picks up the keys — so the first crew on site is executing a document, not improvising.

Planned for first-time buyers condo & co-op closings relocations to Fairfield County inherited & estate homes
Planning desk with a marked floor plan, architect's scale and finish samples
Fig. 03 — The office, mid-file

02Origin

The expensive decisions are made in the first week.

Empty room with floor tape marking furniture positions and a rolled drawing Fig. 04 — Day zero

New owners close on a house and inherit forty open questions.

Which wall moves. Which tile has a twelve-week lead time. Whether the vanity clears the door swing. Left unanswered, these become change orders, priced by a crew standing in the room.

Renova Move was set up to answer them earlier. From our office at 1450 Washington Blvd in Stamford, we take a floor plan, a short phone video of each room and a closing date, and return a numbered set of documents: dimensioned layouts, a finish schedule, 3D mockups and a trade-by-trade scope of work.

The work is billed as a fixed fee, agreed in writing, and invoiced. There is no hourly meter, and no figure changes after acceptance without a written quote.

03Principles

Four rules the office does not bend.

Set down once, applied to every file, regardless of its size.

  1. P·01

    Specify, never suggest

    A finish is named by manufacturer, colour, size and lead time. “Warm white subway tile” is not a specification, and it is not on our schedules.

  2. P·02

    Mark what is unverified

    We do not visit the house, so every dimension we cannot confirm from your documents is listed on a measurement checklist for your contractor to check before ordering.

  3. P·03

    Write the scope so bids compare

    Quantities, allowances and references appear in the same order for every trade, so two contractors price one job and the totals can be read side by side.

  4. P·04

    Quote before the work, in writing

    The fee, the delivery date and the number of revision rounds are agreed before a drawing begins. A further round is $210 per room, quoted ahead of time.

04File standards

From the first email to the signed scope.

How a file moves through the office, and what we need from you to start it.

Day 0 · Consultation

Closing date and budget range

A planning call fixes the rooms in play and the date you take possession. The fee and delivery date are confirmed in writing.

Days 1–3 · Intake

Documents reviewed

Floor plan or listing PDF, plus a 20-second video per room. A measurement checklist goes back to you the same week.

Days 4–10 · Drafting

Layouts, schedules, mockups, scope

Two layout options per room, one finish palette, two 3D views, and a scope in trade sequence. A Whole-Floor Plan is delivered in 10 business days.

After delivery · Revision

Two rounds in the fee

Corrections are folded into the numbered set and reissued, so your contractor never holds an out-of-date page.

05Remote practice

Planned from Stamford, sent anywhere.

R1Why remote

Faster to start, fixed in cost

With no site visits to schedule, work begins the week documents arrive. Travel is not billed because it does not occur; the fee you are quoted is the fee on the invoice.

  • Fixed fee, billed by invoice
  • Work scheduled against your closing date
  • Issued as numbered PDFs your contractor can mark up
See the services and fees
Printed plan set with numbered tabs beside a phone showing a room video

06Open a file

Settle the house before you move in.

Send the address, your closing date and the rooms in question to 1450 Washington Blvd Unit 1308S, Stamford, CT 06905 — or simply call. Hours are by appointment.